Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
The Torbay is one of our most popular designs. You will be able to enjoy your beverage of choice while enjoying the outside ambience.
In most cases we can deliver and connect to utilities within 12 weeks. As well as setup the furniture package so then it's ready for you to use, or lease out. We deliver and install in Perth Metro and Regional WA, however your delivery allowance is up to 100km from Perth CBD which is included in the below price.
If you don't like one of the below designs, ask us about custom designing a tiny home for your exact needs.
All prices include GST.
Mixed range of double brick, tin roof to prefab and modular. Please contact our brokers arrange an appointment and go through your requirements. We can also use the big screen in our showroom to show you what it will look like on your property and you can walk around the floorplan at a 1:1 scale to see how much internal room you will have.
Appointments available 7 days per week.
Unit 6, 1 Pitino Court Osborne Park.
Closed Public Holidays.
To obtain owner-builder approval all the owners of the land must submit an application for owner builder approval to DEMIR that contains:
• personal details of each land owner, supported by identification;
• evidence of ownership of the land, such as a current land title search (available through Landgate);
• a summary of your plan to undertake the building project;
• building drawings demonstrating a reasonable level of detail for the construction of the proposed building, including a site plan, floor plan and elevation plans;
• evidence that at least one of the applicants holds knowledge of the duties and responsibilities of an owner-builder. Evidence includes proof of completing an owner-builder course, relevant building experience, or current registration as a building practitioner. The same applicant must also provide proof of completing construction induction white card training;
• declaration signed and dated by each land owner; and
• payment of the application fee.
The team at Builderz WA can't recommend enough to consider being an owner-builder. It's a life changing experience, and if done correctly you will be beyond proud of your achievements.
Penalties apply for failing to obtain a building permit before commencing building work.
We recommend completing an online owner-builder course and getting your white card. It's best to know as much as you can before starting your owner-builder journey.
Department of Energy, mines, Industry Regulation & Safety (DEMIR) is the authority you need to apply to, to become an owner builder.
Owner builders are required to obtain construction & public liability insurance. As an owner builder, building site safety is your responsibility.
Open Studio 6000 x 6000
One Bedroom & One Bathroom With Kitchenette 6000 x 8350
Private Studio 10100 x 3450
Two Bedroom & One Bathroom With Kitchenette 8430 x 9030
Two Bedroom & Two Bathroom With Kitchenette 10000 x 6000
Two Bedroom & Two Bathroom With Kitchenette 11770 x 11900
We have an in house finance brokerage that can help you with the most suitable finance solution for your circumstances.
3600 x 3600
3600 x 4800
6300 x 6300
6400 x 6400
8200 x 8200
One Bedroom & One Bathroom
Includes delivery, installation, utilities connected up to 10m and a basic furniture package that has the essentials to lease out straight away.
Materials:
Galvanised Steel Frame, Internal Canvas Walls and Wood Front Deck.
Inclusions:
PVC Fly Roof
RT 12oz Canvas Body
Mesh Fabric Windows & Doors
Timber Look Vinyl Flooring
WPC Decking - 1080 x 3600
Galvanised Structural Steel Frame
Galvanised Steel Poles
Adjustable Feet (for un-even ground up to 100mm)
All Ropes, Rigging & Ratchet Straps Required
Bathroom Enclosure - 900 x 3600
Freestanding Shower Cube
Concealed Cistern With Back To Wall Toilet
Vanity Unit With Ceramic Basin
Transport Box - 3.6m x 1m x 1m
Need To Know:
Colour Option - Beige PVC, Red Sand Canvas & Teak WPC Decking
Delivery & Installation Time Frame - 12 to 15 weeks from order date. Payment required at time of order.
One Open Bedroom, One Bathroom, Kitchenette & One Living Area
Includes delivery, installation, utilities connected up to 10m and a basic furniture package that has the essentials to lease out straight away.
Materials:
Galvanised Steel Frame, Metal Sheet Cladding to External Walls, Powder Coated Aluminum Windows & Sliding Doors with Fly Screen, 5 Degree Metal Roof Sheets & Flashings.
Inclusions:
Wall Panel System Painted White
Insulation to Walls, Roof & Ceiling
FC w/ Trims
10mm Plasterboard Ceiling
16mm CFC Floor Sheet
Timber Look Vinyl Flooring
Toilet
Pref-fab Vanity & Mirror
Basin Mixer
Shower Mixer
Shower Rail & Head
Toilet Roll Holder
Towel Rail & Robe Hook
Shower Screen, Acrylic Walls & Base
Kitchenette Stone Counter Top, Stainless Steel Sink & Tap. 1800 x 800 Two Shelf, Four Door Cabinetry With Bar Fridge Recess.
Hot Water Unit.
Wood Decking 6450 x 1080 With Steps.
Need To Know:
Colour Option - Charcoal Exterior & Painted White Internally
Site Must Be Cleared, Level & Suitable for Installation.
Suitable Weather & Working Conditions are Required for Installation.
Delivery & Installation Time Frame - 18 weeks from order date. Payment required at time of order.
01/25
Three Bedroom x Three Bathroom
Suitable for a 12m wide x 27m deep lot
Target Weekly Rental Income $960
Three Bedroom x Three Bathroom
Suitable for a 12m wide x 27m deep lot
Target Weekly Rental Income $1280
Five Bedroom x Three Bathroom
Suitable for a 12.5m wide x 25m deep lot
Target Weekly Rental Income $1425
3000 x 6000
6000 x 6000
4000 x 4000
Two sides with motorised shutters
3600 x 2400
8000 x 3600
Send in your details below and our admin team will email you a complimentary design of where the eco-tent, tiny home or yard pod can be located on your property and a quote.
If you like what you see, then please make an appointment.
Having a meeting with a potential client is a must. This is so we understand what the client wants, and why.
We also go through all of the product materials, inclusions, delivery & install date as well as if you would like us to help you with the property management.
This can be done face to face, at your property, at our office or can be done online using Google Meet.
Once you're happy and choose to proceed, you make the order. Signing the agreement and making payment within 7 days.
Once payment is received, you will be given a delivery date. If the delivery date is not convenient, you can let our team know and it can be changed to a later date.
Luca, head of construction will arrive and introduce himself. A team of four will install the eco-tent or tiny home. We require access from 8am to 5pm Monday to Friday.
Luca, will manage our electrician and plumber to connect to utilities. Extra charges above 10m from connection point apply.
At this stage, internal wall systems are painted.
Kirsty, head of internal build will manage the delivery and setup of furniture. Everything will be setup for someone to move in.
At this stage, we will present the finished product to you for approval. If you feel that anything is not up to standard, please let us know and we will rectify the situation.
If you would like us to property manage, finding a suitable tenant for you, please let us know so we can organise for this to occur lining up with expected handover date, and to suit when you desire a tenant to move in.
Builderz WA, your local builder broker.
1 Pitino Court, Osborne Park Western Australia 6017, Australia
Open today | 09:00 am – 04:00 pm |
Builderz WA - WA's Best Builder Broker
Copyright © 2024 Builderz WA - All Rights Reserved.
We use cookies so we know what is useful and what is not. By saying yes to cookies, we can make the website better.